{"id":195,"date":"2011-10-11T09:55:50","date_gmt":"2011-10-11T08:55:50","guid":{"rendered":"https:\/\/www.marense.com\/wp\/?page_id=195"},"modified":"2020-04-28T13:38:02","modified_gmt":"2020-04-28T12:38:02","slug":"pert","status":"publish","type":"page","link":"https:\/\/www.marense.com\/en\/project-management\/pert-chart\/","title":{"rendered":"PERT chart"},"content":{"rendered":"<p><strong>PERT<\/strong> is a method to put in order through network, several tasks which, with their dependencies and their timing all contribute to obtaining a finished product.<br \/>\n<strong>PERT<\/strong> is often synonymous of important project management with a long term planning. Therefore, a number of actions are necessary for a successful implementation:<\/p>\n<ul>\n<li>Define very precisely the scheduling project,<\/li>\n<li>Set a project manager, which we will report and take important decisions,<\/li>\n<li>Analyze the project by large groups of tasks and detailing tasks if necessary,<\/li>\n<li>Precisely define the tasks and determine their duration,<\/li>\n<li>Look for matching costs which may eventually undermine certain tasks,<\/li>\n<li>Perform periodic checks to verify that the system does not drift.<\/li>\n<\/ul>\n<p><a href=\"https:\/\/www.marense.com\/wp-content\/uploads\/2015\/12\/PERT.jpg\" rel=\"attachment wp-att-2231\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-2231 size-full\" src=\"https:\/\/www.marense.com\/wp-content\/uploads\/2015\/12\/PERT.jpg\" alt=\"PERT chart, PERT diagram, Project management, Planning, Critical path\" width=\"680\" height=\"533\" srcset=\"https:\/\/www.marense.com\/wp-content\/uploads\/2015\/12\/PERT.jpg 680w, https:\/\/www.marense.com\/wp-content\/uploads\/2015\/12\/PERT-300x235.jpg 300w, https:\/\/www.marense.com\/wp-content\/uploads\/2015\/12\/PERT-624x489.jpg 624w\" sizes=\"auto, (max-width: 680px) 100vw, 680px\" \/><\/a><\/p>\n<p>Unlike the <a href=\"https:\/\/www.marense.com\/en\/project-management\/gantt-chart\/\">GANTT<\/a> chart, <strong>PERT<\/strong> is especially committed to highlight the links that exist between the various project tasks and define the way says &#8220;critical&#8221;. The <strong>PERT<\/strong> chart is composed of steps and tasks (or operations). Tasks are represented by arrows. The length of arrows has no significance; there is no proportionality in time.<\/p>\n<p>For any question, do not hesitate to\u00a0<a href=\"https:\/\/www.marense.com\/en\/contact-us\/\">contact us<\/a>\u00a0!<\/p>","protected":false},"excerpt":{"rendered":"<p>PERT is a method to put in order through network, several tasks which, with their dependencies and their timing all contribute to obtaining a finished product. PERT is often synonymous of important project management with a long term planning. Therefore, a number of actions are necessary for a successful implementation: Define very precisely the scheduling [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":194,"parent":187,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-195","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/www.marense.com\/en\/wp-json\/wp\/v2\/pages\/195","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.marense.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.marense.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.marense.com\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.marense.com\/en\/wp-json\/wp\/v2\/comments?post=195"}],"version-history":[{"count":12,"href":"https:\/\/www.marense.com\/en\/wp-json\/wp\/v2\/pages\/195\/revisions"}],"predecessor-version":[{"id":3845,"href":"https:\/\/www.marense.com\/en\/wp-json\/wp\/v2\/pages\/195\/revisions\/3845"}],"up":[{"embeddable":true,"href":"https:\/\/www.marense.com\/en\/wp-json\/wp\/v2\/pages\/187"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.marense.com\/en\/wp-json\/wp\/v2\/media\/194"}],"wp:attachment":[{"href":"https:\/\/www.marense.com\/en\/wp-json\/wp\/v2\/media?parent=195"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}